Site Tour: Capital Power Strathmore Solar Farm
Complete your conference experience by visiting Capital Power’s Strathmore Solar Farm outside of Calgary. The Strathmore Solar Farm is a 40.5 megawatt (MW) solar facility located on 320 acres of industrial use Town land in the Town of Strathmore, Alberta, immediately adjacent to the AltaLink Strathmore Substation.
Date: October 28, 2026
Tour Time: 2:00–4:30 PM
Location: North west quarter and south half of Section 12, Township 24, Range 25, Meridian 4.
Click here for a detailed map.
Transportation Details:
- Private shuttle bus included.
- Shuttle will depart DoubleTree by Hilton Calgary North Hotel at 2:00 pm and guests will arrive at approximately 2:45 pm.
- Tour concludes at 4:00 pm and shuttle bus returns site tour attendees back to DoubleTree by Hilton Calgary North.