Ruben SimonTurnaround SupervisorKoch Fertilizer Canada ULC
This session establishes the foundation for a disciplined turnaround planning cycle. The focus shifts from conceptual planning to validated, evidence-based readiness—ensuring assumptions, scope, and timelines are grounded in real-world constraints.
We will cover:
- Benchmarking best practices: Using internal and external comparators to assess competitiveness, validate run lengths, and set realistic planning assumptions
- Building the corporate turnaround forecast: Assessing event complexity to determine planning duration
- Establishing a realistic, data-driven view of what the organization can support
- Validating planning assumptions: Testing schedule logic, contractor capacity, and historical performance
- Identifying early top risks: Surfacing high-impact risks tied to scope, workforce, and schedule confidence
- Budgeting and securing long-lead resources: Locking in critical commitments early to avoid costly surprises
- Planning to plan: Aligning teams, clarifying objectives, and creating the foundation for disciplined execution
- Defining work packages and surfacing early scope risks: Breaking down the work and identifying challenges before they escalate
- Freezing the final scope: Establishing and enforcing the formal scope-freeze milestone
Break

Laszlo KardosSenior Advisor, Planning and SchedulingProgressive Plan International
This phase converts approved scope into fully executable plans. This phase emphasizes prove-it readiness, not just planning completeness, ensuring materials, contractors, and documentation are aligned before the shutdown window opens.
We will cover:
- Finalizing scope and confirming all work packages: Validating completeness, resolving gaps, and locking the work breakdown
- Optimizing your schedule and revising your work list to include all added work
- Material verification vs. plan: Confirming actual receipts, shortages, and substitutions
- Identifying and procuring long-lead materials
- Contractor readiness and integration: Workforce onboarding timelines, leadership alignment, QA/QC expectations, turnover requirements, and contractor-identified risks
- Contractor performance scoring: Evaluating capability, past performance, and risk indicators
- Developing procedures, permits, and safety protocols: Building the documentation backbone for safe, compliant execution
- Conducting midpoint readiness checks, validating progress and correcting drift before entering the planning window
Break

Adam WoodruffSr.Turnaround Event ManagerNutrien
Gate 3 is the most critical readiness checkpoint. This is where real gaps surface and where teams distinguish between being “plan-ready” and execution ready. The focus is on field-verified readiness, contractor alignment, and risk exposure.
We will cover:
- Validating organizational readiness: Confirming teams, roles, decision authority and workflows
- Critical path validation: Ensuring schedule logic, constraints, and contingencies are aligned
- Top execution risks and mitigations: Defining the top 5–10 risks, owners, triggers, and recovery plans
- Contractor execution readiness: Workforce levels, supervision ratios, onboarding, and contractor-identified risks
- Ensuring contracts, materials, and equipment are onsite and removing logistical risk before the clock starts
- Completing pre-shutdown field work including scaffolding, staging, prefabrication, system flushing, and other enabling tasks
- Field-verified readiness: Walkdowns, laydown checks, and physical confirmation of readiness
- Conducting final readiness reviews and risk mitigation: Stress-testing assumptions and closing remaining vulnerabilities
Break

Frank EngliSenior Advisor, Maintenance & TurnaroundsBecht
Execution is the shortest phase but highest risk phase. This session emphasizes real-time risk management and critical path protection. Once the plant returns to steady operation, a disciplined closeout ensures every insight becomes an input for the next cycle.
We will cover:
- Managing the highest-risk phase: Navigating stacked work fronts, rapid decision cycles, and real-time problem solving
- Protecting the critical path: Preventing schedule slip and maintaining shutdown discipline
- Real-time risk monitoring — Tracking leading indicators, contractor performance, and schedule threats
- Executing startup and achieving steady operation: Coordinating system restoration, testing, and safe handover
- Capturing lessons learned and feeding Gate 1
- Converting field insights into actionable improvements for the next turnaround
- Ensuring documentation is filed to be used for the next turnaround cycle